(5) Check that the nitrogen is passing through the unit A liquid pipe.
(6) Flushing.
Block the end of the pipe with the insulation of your hand.
When the gas pressure becomes too great to contain remove insulation quickly. (First flush)
Block the end of the pipe with insulation again.
(Carry out second flushing)
(The nature and amount of the extraneous material inside the pipe can be checked during flushing
by placing a rag lightly over the end of the pipe. In the unlikely case that even a small quantity of
moisture is found then the inside of the pipe should be dried out thoroughly.)
Action:
Flush the inside of the pipe with nitrogen gas. (Until such time as the moisture disappears.)
Carry out a thorough vacuum drying operation. (See page 34)
_ Close the main valve on the nitrogen cylinder.
_ Repeat the above operation for unit B.
_ When the liquid pipe operations have been completed then do the same with the gas pipes.