Final check and trial operation
To complete the installation, perform the following checks and tests to
ensure that the air conditioner operates correctly.
Check the followings:
•Strengthoftheinstallationsite
•Tightnessofpipeconnectiontodetectgasleak
•Electricwiringconnection
•Heat-resistantinsulationofthepipe
•Drainage
•Groundingconductorconnection
•Correctoperation(followthestepsbelow)
1. Press the Power
button and check the following:
The indicator on the indoor unit lights up.
The airow blade opens and the fan gears up for operation.
3. Press the Air swing
button and check the following:
The airow blades work properly.
4. Press the Power
button to stop the operation.
2. Press the Mode button to select Cool mode.
In Cool mode, use Temp hr. + or button and set the temperature at 16°C.
Cooling mode (indoor unit check) Inletairtemp.-Outletairtemp:
From 10°C to 12°C (indicative delta T)
• Approximately3~5minuteslater,outdoorunitwillstarttooperateandthe
Cool air will blow out.
• After12minutesofstationaryconditionchecktheindoorunitairtreatment.
• Whenyoucompletetheinstallationsuccessfully,handoverthismanualtotheuserforstorageinahandyandsafe
place.
English-43
INSTALLATION05
Zobrazit stránku 42
1 2 ... 38 39 40 41 42 43 44 45 46 47

Komentáře k této Příručce

Žádné komentáře