Samsung SV-651B Servisní příručka Strana 83

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 226
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 82
GE HEALTHCARE
D
IRECTION 5194296-100, REVISION 10 LOGIQ BOOK XP SERIES BASIC SERVICE MANUAL
Chapter 3 Installation 3-27
Section 3-9
Loading the System Software
NOTE: System Software may also be referred to as the Base Image or Ghost.
NOTE: Before loading the system software, please ensure that the power can be continuously supplied
and there is no risk of power cut off during loading procedure.
There are three methods to load the system software:
Load the system software with CD. Refer to section 3-9-1 "Loading the System Software with CD"
from page 3-28 to page 3-32
Load the system software with DVD. Refer to section 3-9-2 "Loading the system software with DVD
(For R2.2.2)" from page 3-33 to page 3-37
Load the system software with USB memory stick. Refer to section 3-9-3 "Loading the System
Software with USB Memory Stick (For R2.2.2 or above)" from page 3-38 to page 3-42
WARNINGWARNING
While the software install procedure is designed to preserved data, you should save
any patient data, images, system setups and customer presets to CD, DVD, USB Flash
Drive, or USB Hard Disk before doing a software upgrade.
Zobrazit stránku 82
1 2 ... 78 79 80 81 82 83 84 85 86 87 88 ... 225 226

Komentáře k této Příručce

Žádné komentáře